Skip to content
Bharat Portable Cabin

Railways & signalling · Updated 18 October 2026

Railway relay rooms — prefabricated signalling and equipment rooms

Signalling upgrades put equipment rooms at every station, level crossing and block section. We build them as finished, insulated relay rooms that arrive ready to set on a plinth beside the track.

Quick answer

What is a railway relay room, and can it be prefabricated?

A railway relay room is the equipment room that houses a station's or section's signalling relays, interlocking, power supply and telecom panels. Bharat Portable Cabin builds prefabricated relay rooms and relay huts at its Umbergaon factory: insulated PUF panels on a steel frame and skid, with cable entries, earthing, lighting and AC provisions, laid out to the tender drawing and delivered finished.

  • Relay rooms, relay huts, IPS/battery rooms and telecom equipment rooms
  • Built to the layout and specification in your tender or the railway's drawing
  • Factory-built in parallel with the plinth and cable trenches
  • Delivered by road to the station or nearest crane-accessible point
White steel equipment room with an air-conditioner outdoor unit, set on a concrete plinth

Overview

Every signalled railway depends on rooms that rarely get noticed: the relay room at a station that holds the interlocking, the relay huts at level crossings and automatic signalling sections, and the rooms for the integrated power supply (IPS), batteries and telecom equipment. Electronic interlocking, automatic block signalling, train protection and new freight and metro corridors all add more of them, often at sites with little room and little time for masonry construction.

A prefabricated relay room is built in a factory while the plinth and cable trenches are prepared at site, then lifted into place as a finished room. We build the envelope from insulated PUF sandwich panels on a steel frame and skid, so the interior stays cooler and dust-free for relay racks and electronics, and plan the cable entries, earthing points, lighting, AC provisions and door positions from your layout before fabrication, not by cutting on site.

The specification comes from the project: the railway's or the signalling contractor's drawing, the tender's technical requirements and the equipment supplier's rack and clearance data. We build the room to that specification and coordinate with your signalling team on dimensions and access. For enclosure construction detail, see our E-House page; this page covers how railway and metro projects use these rooms.

What we supply

Configured for the job.

  • Station relay rooms

    Relay rooms for station interlocking, sized to the relay racks and panels, with cable entries, earthing and AC provisions.

  • Relay huts for level crossings and block sections

    Compact insulated huts for relays and equipment at level crossings, automatic signalling sections and along new lines.

  • IPS, battery and telecom equipment rooms

    Rooms for the integrated power supply, batteries and telecom racks, as separate units or partitioned compartments with their own ventilation.

  • Container equipment rooms

    Converted 20 ft or 40 ft containers fitted out as equipment rooms where a container shell suits the site or the tender.

  • Site offices and staff cabins

    Portable offices, rest rooms and stores for signalling and track contractors during the works.

FAQ

Questions, answered.

Do you make railway relay rooms?

Yes. Bharat Portable Cabin builds prefabricated railway relay rooms and relay huts, along with IPS, battery and telecom equipment rooms, at its factory in GIDC Umbergaon, Gujarat, and delivers them by road to stations and sites across India.

What is a relay hut?

A relay hut is a small equipment room that houses signalling relays and associated equipment at a level crossing, an automatic signalling section or a remote location along the line. A prefabricated relay hut arrives finished and is set on a prepared plinth with cable entries aligned to the trench.

Which specification do you build a relay room to?

To the specification of your project: the railway's or signalling contractor's drawing, the tender's technical requirements and the equipment supplier's rack and clearance data. Share those, and we build the room to them and send drawings for approval before fabrication.

What do you need to quote a relay room?

The layout drawing or room size, the equipment and rack list, cable entry positions, any partition for IPS or batteries, AC or ventilation needs, the number of rooms and the site locations. WhatsApp or call +91 84848 12433 with these for a proposal.

Can a relay room be delivered to a station with limited access?

Usually, with planning. Rooms are sized for road transport, and we plan the vehicle, the route and the crane position with your site team. Where a site cannot take a crane close to the plinth, the room can be sized smaller or split into modules.